Sierra County, New Mexico
Off-grid grade B, ranked 61 of 125 counties from southern Colorado to west Texas. Here is how the grade is worked out, with the rules and the public data behind it.
Six scores, one grade.
| Score | Weight | 0 to 100 | Points | What we found | |
|---|---|---|---|---|---|
| Water | 25% | 90 | 22.5 | From state and county rules, below | |
| Permits | 20% | 87 | 17.4 | From state and county rules, below | |
| Rain and snow | 15% | 28 | 4.2 | 12.4 inches a year | |
| Land price | 15% | 100 | 15.0 | $406 per acre (farm land and buildings) | |
| Hazards | 15% | 58 | 8.7 | Wildfire relatively low, flood relatively moderate, drought relatively moderate | |
| Sun | 10% | 73 | 7.3 | 1,922 kWh per kW of panels a year | |
| Grade | 75 | B |
90 x 25% + 87 x 20% + 28 x 15% + 100 x 15% + 58 x 15% + 73 x 10% = 75
Water: 90 of 100
- Household well35 of 40
Household wells are generally available, but the western edge falls in a decreed Gila area that limits new wells to indoor household use.
- Rainwater as your supply30 of 30
The State Engineer allows rooftop rainwater harvesting statewide for on-site household use with no volume limit stated.
- Groundwater basin25 of 30
The Hot Springs areas are closed to new non-domestic and mineral water appropriations, and a decreed Gila area reaches the western edge.
Permits: 87 of 100
- Who issues permits20 of 20
Sierra County has no building department; its rural address form tells owners to get a building permit from the state Construction Industries Division (CID) before building.
- Rainwater supply accepted15 of 20
The state plumbing code adopts the 2021 UPC with all appendices, which include potable rainwater catchment rules, but no county or CID guidance confirming a cistern as the only house supply was found.
- Composting toilets, greywater12 of 20
State rules allow composting toilets and household graywater under 250 gallons a day, but a composting toilet does not reduce the required septic design flow, so a full septic permit is still needed.
- Owner-builder20 of 20
CID issues homeowner permits for an owner's own primary residence, with a state exam required before the owner does electrical or plumbing work.
- Off-grid power20 of 20
The state electrical code (2020 NEC) covers stand-alone solar systems and no state or county rule requiring a utility connection was found.
- NM CID: Building Permit Guide for Residential Construction (2024)
- 14.8.2 NMAC: 2021 New Mexico Plumbing Code (adopts 2021 UPC and all appendices)
- 20.7.3 NMAC: NMED Liquid Waste Disposal and Treatment (803 composting toilets, 810 graywater)
- 14.5.2 NMAC: CID Permits, including homeowner's permit (14.5.2.18)
- 14.10.4 NMAC: 2020 New Mexico Electrical Code (2020 NEC)
- Sierra County: Application for Rural Address (building permit from NM CID before construction)
Rules checked 2026-11-28. Rules change: check with the county and the state before you buy or build.
What would raise this grade.
Rule changes that would earn Sierra County more points, largest first. We never count looser well or groundwater rules: those protect the water everyone shares.
- Accept composting toilets and greywater systems for homes+1.6 points
The State of New Mexico sets this
No county in the region does this yet.
- Accept a rainwater cistern as a home's only water supply+1.0 points
The county can do this
Already done in Torrance County, NM (source).
Found land here? Check it.
The county grade is the big picture. A parcel can still sit in a flood zone, on poor soil for a septic system, or far from a well that works.
Sources
- Rain and snow: PRISM Group, Oregon State University, 1991 to 2020 normals, 4 km grid, averaged over the county.
- Sun: PVGIS 5.3, European Commission Joint Research Centre, at the middle of the county, panels at the best tilt.
- Hazards: FEMA National Risk Index, December 2025.
- Land value: USDA National Agricultural Statistics Service, 2022 Census of Agriculture, Table 8.
- Water and permit rules: the state and county sources linked above.
- County boundaries: US Census Bureau, TIGER/Line.