Santa Fe County, New Mexico

Off-grid grade C, ranked 113 of 125 counties from southern Colorado to west Texas. Here is how the grade is worked out, with the rules and the public data behind it.

01The grade

Six scores, one grade.

ScoreWeight0 to 100PointsWhat we found
Water25%6516.2From state and county rules, below
Permits20%8717.4From state and county rules, below
Rain and snow15%436.514.8 inches a year
Land price15%6710.1$1,245 per acre (farm land and buildings)
Hazards15%426.3Wildfire relatively high, flood relatively moderate, drought relatively moderate
Sun10%929.21,983 kWh per kW of panels a year
Grade66C

65 x 25% + 87 x 20% + 43 x 15% + 67 x 15% + 42 x 15% + 92 x 10% = 66

Scores for rain and sun use the parts of the county outside tribal land.

02Water

Water: 65 of 100

  1. Household well20 of 40

    On lots created after December 13, 2016 household well use is capped at 0.25 acre-foot a year with a meter, and new homes near county water lines must connect instead of drilling.

  2. Rainwater as your supply30 of 30

    Rooftop rainwater is legal with no volume limit, and the county requires catchment cisterns on new homes and exempts harvested rainwater from its well use cap.

  3. Groundwater basin15 of 30

    The southern county is in the Estancia critical management area, where household wells are limited, and the northern Pojoaque basin has court-approved rules requiring metering and water right transfers for new domestic wells.

03Permits

Permits: 87 of 100

  1. Who issues permits20 of 20

    Santa Fe County issues a development permit under its land development code, and CID issues the building permit and inspections.

  2. Rainwater supply accepted15 of 20

    The county requires rainwater cisterns and lets catchment water be plumbed for household use, but no rule naming a cistern as the only house supply was found.

  3. Composting toilets, greywater12 of 20

    State rules allow composting toilets and household graywater under 250 gallons a day, but a composting toilet does not reduce the required septic design flow, so a full septic permit is still needed.

  4. Owner-builder20 of 20

    CID issues homeowner permits for an owner's own primary residence, with a state exam required before the owner does electrical or plumbing work.

  5. Off-grid power20 of 20

    The state electrical code (2020 NEC) covers stand-alone solar systems and no state or county rule requiring a utility connection was found.

Rules checked 2026-11-28. Rules change: check with the county and the state before you buy or build.

04Raising the grade

What would raise this grade.

Rule changes that would earn Santa Fe County more points, largest first. We never count looser well or groundwater rules: those protect the water everyone shares.

  1. Accept composting toilets and greywater systems for homes+1.6 points

    The State of New Mexico sets this

    No county in the region does this yet.

  2. Accept a rainwater cistern as a home's only water supply+1.0 points

    The county can do this

    Already done in Torrance County, NM (source).

05Next step

Found land here? Check it.

The county grade is the big picture. A parcel can still sit in a flood zone, on poor soil for a septic system, or far from a well that works.

Sources

  • Rain and snow: PRISM Group, Oregon State University, 1991 to 2020 normals, 4 km grid, averaged over the county.
  • Sun: PVGIS 5.3, European Commission Joint Research Centre, at the middle of the county, panels at the best tilt.
  • Hazards: FEMA National Risk Index, December 2025.
  • Land value: USDA National Agricultural Statistics Service, 2022 Census of Agriculture, Table 8.
  • Water and permit rules: the state and county sources linked above.
  • County boundaries: US Census Bureau, TIGER/Line.