Pangea BiotectureCounty map ยท TXRank 16 of 125Sheet T-090
A79 of 100

Gray County, Texas

Off-grid grade A, ranked 16 of 125 counties from southern Colorado to west Texas. Here is how the grade is worked out, with the rules and the public data behind it.

01The grade

Six scores, one grade.

ScoreWeight0 to 100PointsWhat we found
Water25%10025.0From state and county rules, below
Permits20%9619.2From state and county rules, below
Rain and snow15%9614.423.4 inches a year
Land price15%598.8$1,579 per acre (farm land and buildings)
Hazards15%588.7Wildfire relatively moderate, flood very low, drought relatively high
Sun10%272.71,778 kWh per kW of panels a year
Grade79A

100 x 25% + 96 x 20% + 96 x 15% + 59 x 15% + 58 x 15% + 27 x 10% = 79

02Water

Water: 100 of 100

  1. Household well40 of 40

    Panhandle GCD needs only a registration for wells of 17.5 gpm or less, and new wells must meet its spacing rule 8.1 (a neighbor easement form covers wells near a line).

  2. Rainwater as your supply30 of 30

    Texas sets no volume limit on roof rainwater and supports harvesting by statute (sales tax exemption, no HOA bans, no permit denial for using it).

  3. Groundwater basin30 of 30

    No district or state rule closes this area to new household wells; a registered domestic well is normal administration.

Groundwater district: Panhandle GCD

03Permits

Permits: 96 of 100

  1. Who issues permits20 of 20

    Texas counties have no general power to require residential building permits; no county opt-in to the Local Gov Code 233 Subchapter F notice and inspection rules was found, and an OSSF (septic) permit still applies.

  2. Rainwater supply accepted20 of 20

    A county may not deny a building permit because a home uses rainwater, and public drinking water standards do not apply to a private rainwater system not tied to a public supply.

  3. Composting toilets, greywater18 of 20

    TCEQ accepts composting toilets certified to NSF Standard 41 under 30 TAC 285.34, and residential graywater under 400 gallons a day needs no TCEQ authorization; remaining wastewater still needs an OSSF permit.

  4. Owner-builder20 of 20

    Texas has no general contractor license, and owners may do their own plumbing in their homestead and electrical work in a home they own and live in.

  5. Off-grid power18 of 20

    No state or county rule was found that requires a utility connection for a dwelling in unincorporated Texas, so a PV off-grid home has a clear path (based on absence of any such rule).

Rules checked 2026-11-28. Rules change: check with the county and the state before you buy or build.

04Raising the grade

What would raise this grade.

Rule changes that would earn Gray County more points, largest first. We never count looser well or groundwater rules: those protect the water everyone shares.

This county already scores full marks on every rule a county or state can change.

05Next step

Found land here? Check it.

The county grade is the big picture. A parcel can still sit in a flood zone, on poor soil for a septic system, or far from a well that works.

Sources

  • Rain and snow: PRISM Group, Oregon State University, 1991 to 2020 normals, 4 km grid, averaged over the county.
  • Sun: PVGIS 5.3, European Commission Joint Research Centre, at the middle of the county, panels at the best tilt.
  • Hazards: FEMA National Risk Index, December 2025.
  • Land value: USDA National Agricultural Statistics Service, 2022 Census of Agriculture, Table 8.
  • Water and permit rules: the state and county sources linked above.
  • County boundaries: US Census Bureau, TIGER/Line.