Pangea BiotectureCounty map · NMRank 9 of 125Sheet T-090
A80 of 100

De Baca County, New Mexico

Status Being confirmed: we could not find an official page that names the office issuing building permits here. The permits score may change once it is confirmed.

Off-grid grade A, ranked 9 of 125 counties from southern Colorado to west Texas. Here is how the grade is worked out, with the rules and the public data behind it.

01The grade

Six scores, one grade.

ScoreWeight0 to 100PointsWhat we found
Water25%10025.0From state and county rules, below
Permits20%8517.0From state and county rules, below
Rain and snow15%365.413.7 inches a year
Land price15%10015.0$385 per acre (farm land and buildings)
Hazards15%7511.2Wildfire relatively low, flood very low, drought relatively moderate
Sun10%646.41,895 kWh per kW of panels a year
Grade80A

100 x 25% + 85 x 20% + 36 x 15% + 100 x 15% + 75 x 15% + 64 x 10% = 80

02Water

Water: 100 of 100

  1. Household well40 of 40

    A household well permit under the state domestic well statute is issued by the State Engineer for up to 1 acre-foot a year; only a few small state-sold Pecos River tracts carry deed limits barring new wells.

  2. Rainwater as your supply30 of 30

    The State Engineer allows rooftop rainwater harvesting statewide for on-site household use with no volume limit stated.

  3. Groundwater basin30 of 30

    The State Engineer's water right regulations map shows no critical management area, closure or domestic well limit in the county beyond those deed-restricted tracts.

03Permits

Permits: 85 of 100

  1. Who issues permits18 of 20

    The state Construction Industries Division (CID) issues building permits here under its published residential process, but no county page confirming the county's own sign-offs was found.

  2. Rainwater supply accepted15 of 20

    The state plumbing code adopts the 2021 UPC with all appendices, which include potable rainwater catchment rules, but no county or CID guidance confirming a cistern as the only house supply was found.

  3. Composting toilets, greywater12 of 20

    State rules allow composting toilets and household graywater under 250 gallons a day, but a composting toilet does not reduce the required septic design flow, so a full septic permit is still needed.

  4. Owner-builder20 of 20

    CID issues homeowner permits for an owner's own primary residence, with a state exam required before the owner does electrical or plumbing work.

  5. Off-grid power20 of 20

    The state electrical code (2020 NEC) covers stand-alone solar systems and no state or county rule requiring a utility connection was found.

Rules checked 2026-11-28. Rules change: check with the county and the state before you buy or build.

04Raising the grade

What would raise this grade.

Rule changes that would earn De Baca County more points, largest first. We never count looser well or groundwater rules: those protect the water everyone shares.

  1. Accept composting toilets and greywater systems for homes+1.6 points

    The State of New Mexico sets this

    No county in the region does this yet.

  2. Accept a rainwater cistern as a home's only water supply+1.0 points

    The county can do this

    Already done in Torrance County, NM (source).

05Next step

Found land here? Check it.

The county grade is the big picture. A parcel can still sit in a flood zone, on poor soil for a septic system, or far from a well that works.

Sources

  • Rain and snow: PRISM Group, Oregon State University, 1991 to 2020 normals, 4 km grid, averaged over the county.
  • Sun: PVGIS 5.3, European Commission Joint Research Centre, at the middle of the county, panels at the best tilt.
  • Hazards: FEMA National Risk Index, December 2025.
  • Land value: USDA National Agricultural Statistics Service, 2022 Census of Agriculture, Table 8.
  • Water and permit rules: the state and county sources linked above.
  • County boundaries: US Census Bureau, TIGER/Line.