What can I build here?
The Site Report answers that for one parcel in Taos County, with more of northern New Mexico coming. It goes past the free Site Check: zoning and setbacks, the area you can build on, slope from lidar, water, access and power, rough site-work costs and the permits you need. A person at Pangea Biotecture checks every report before it is sent.
One parcel. Checked by a person at Pangea Biotecture. Sent in 2 to 3 business days. It counts toward a design contract with Pangea Biotecture.
A feasibility report, not a survey, an engineering stamp or a zoning ruling.
“What can I build here?” in one page.
Each line gets a plain answer for your parcel: clear, worth a look, or a problem to solve, with where the answer comes from.
- 01Zoning and setbacks
The zone, how far to stay from each line, height, lot coverage and density, each with the code section it comes from.
- 02Buildable area
Your parcel minus setbacks, steep ground, flood zone and ditch buffers, in acres.
- 03Slope
How steep the ground is, from 1 meter lidar, and where it is too steep to build easily.
- 04Flood
FEMA flood zones across the whole parcel, not just one point.
- 05Soil and septic
What the soil survey says about septic and wastewater systems and about foundations.
- 06Wells nearby
Wells within a mile: how many, how deep, and about how deep a well here is likely to be.
- 07Acequias
Ditches on or near the land, their association, and what that can mean for easements and water.
- 08Water rights
Your groundwater basin, what a domestic well permit allows, and how to look up rights that come with the land.
- 09Access
Road frontage, which road, and how long a driveway to the building area would be.
- 10Power
How far the nearest mapped line is, when it is known, and what to ask the electric co-op.
- 11Snow and climate
Climate zone, snowfall, rain for catchwater and sun for solar at your spot.
- 12Permits
Which county permits you need and in what order, with links to the forms.
Maps, a 3D view and rough costs.
The checklist comes with the drawings and numbers behind it.
- ABuildable-area map
The area you can build on, drawn over an aerial photo of your land.
- BSlope map
Slope in bands from flat to steep, with contour lines, over the same photo.
- CA simple 3D view
The land in three dimensions, with the buildable area and a sample home on it.
- DCode limits and sources
Every limit we used, with the code section and date, so you or your designer can check it.
- ERough site-work costs
Cost ranges for the driveway, septic, well, power and grading, for planning, not a bid.
- FWhich permits you need
The permit path for your parcel, step by step, and what each step asks for.
From your order to your inbox.
- 01
You order
Send the address or Taos County parcel number and a few words about what you hope to build.
- 02
We read the land
We gather the public records, lidar and county code for your parcel and work out the checklist, maps and costs.
- 03
A person checks it
A designer at Pangea Biotecture reviews every report before it goes out.
- 04
You get it by email
In 2 to 3 business days: a private web page and a PDF to keep and share.
- 05
It counts toward design
If you go on to a design contract with Pangea Biotecture, the report counts toward it.
The Site Report is a feasibility report, not a survey, an engineering stamp or a zoning ruling. It is built from public maps and records, which can be out of date and are least accurate near edges and lines. Confirm everything with the county and a licensed professional before you buy or build.
Order a Site Report.
Tell us where the land is and how to reach you. If we gave you an access code, add it and your report starts right away.
Not sure yet? Try the free Site Check first: elevation, flood, soil and climate for any spot in New Mexico, in a few seconds.